Hi All,

Please see below about updates to bookable spaces in the SLC moving forward.

If you have any questions, please let me know.

Thanks!


Jake Riesenkonig, H. B. Math
Clubs Manager
Federation of Students<http://www.feds.ca/>, University of Waterloo
519-888-4567 ext. 38420
Student Life Centre, Room 1116

To serve, empower, and represent the undergraduate students of the University of Waterloo.
------------------------------------------------------------------------------------------------------------------------------
Disclaimer: This email and any attachments are for the sole use of the intended recipients and may be privileged or confidential. Any distribution, printing or other use by anyone else is prohibited. If you are not an intended recipient, please contact the sender immediately, and permanently delete all copies of this email and attachments.

From: Scott Pearson
Sent: Wednesday, March 28, 2018 1:53 PM
To: Scott Pearson <scott.pearson at uwaterloo.ca>
Subject: SLC / PAC Construction Update
Importance: High

Good Afternoon,

I just wanted to give you a further update on some of the upcoming changes starting on Monday April 2nd in the Student Life Centre.   There has been one significant change since the previous email on March 22nd - the main stair well to the lower level will be staying open for the time being allowing improved access to the lower level.   It will close for a period of time at a later date for flooring replacement.

Starting on April 2nd - the main floor of the SLC will be substantially affected.  This will only be impacting the newer portion of the building - the original main floor where the Great Hall is located will not be affected.

Here is what is happening:

*        Campus Bubble exterior doors will be closed indefinitely - access is available through the Ring Road, Turnkey, Brubakers, or the SLC/PAC Link
*        Stairs from main floor to the second floor will be closed indefinitely
*        Ramp from main floor to the second floor will be closed indefinitely
*        Access to the lower level will be remain unchanged  - the main stairwell is open, as our stairwells from the Great Hall or access through the Loading Dock or Lower Level doors.
*        Access to the second floor will be available via the elevator, stairwells near the elevator, PAC link, stairwells accessible from above the Bombshelter
*        Access to the third floor will be available from the second floor and the elevator
*        Both passenger elevators will still be available
*        Brubakers, Subway, Campus Bubble and Wasabi will be closed
*        All cafeteria seating areas will be closed

Wayfinding signage will be installed on Monday to provide assistance to users of the building.

If you have any questions, please let me know.

Scott Pearson, BComm
Operations Manager, Student Life Centre
Federation of Students<http://www.feds.ca/>, University of Waterloo
519-888-4567 ext. 37308
Student Life Centre, SLC1113A

To serve, empower, and represent the undergraduate students of the University of Waterloo.
------------------------------------------------------------------------------------------------------------------------------
Disclaimer: This email and any attachments are for the sole use of the intended recipients and may be privileged or confidential. Any distribution, printing or other use by anyone else is prohibited. If you are not an intended recipient, please contact the sender immediately, and permanently delete this email and attachments.

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://listarchive.wusa.ca/clubs/attachments/20180329/83db6581/attachment-0001.html>


More information about the Clubs mailing list